Bỏ qua tới nội dung

Office Collection

Grade A office design & build

A Grade A office demands premium materials, building-standard services and immaculate finishing in every detail. AIC delivers design and build through a single point of contact, working directly with the building management.

What makes it different

Grade A office design & build — get it right from design

A Grade A office is the face of the company to partners and senior hires, so the finish standard must be consistently high — from the reception lobby and meeting rooms to air-conditioning, power and lighting. What decides the result is not expensive furniture but tight coordination between design, construction and the building's technical systems, so the space runs stably and stays beautiful over time.

Grade A office design & build

Done right

The items that decide quality

Reception lobby & guest areas

The lobby is the first touchpoint with partners — premium surface materials, layered lighting and a polished brand backdrop, built to exacting flatness and corner tolerances.

Executive meeting rooms & acoustics

Boardrooms and executive meeting rooms need strong sound insulation and tidy AV and control systems — no echo and no exposed cabling in a formal setting.

Premium materials & finishing

Stone, wood veneer, glass and metal finishes demand high craftsmanship at joints and edges. Durable, stain-resistant materials keep the space looking premium and cut maintenance costs.

Building-standard MEP

Air-conditioning, power, data and ELV must tie into the building's central systems to standard, with loads sized for staff density and equipment — the foundation of stable operation.

Ceilings & architectural lighting

Multi-layer ceilings, recessed fixtures and zone-by-zone lighting create depth. Well-planned lighting delivers proper working illumination while preserving the premium feel.

Building management & as-built handover

Fitting out in a Grade A tower means following the building's rules on works, hours and safety. AIC works directly with the building management and hands over a complete as-built dossier.

Reference spaces

Design directions

Grade A office design & build
Grade A office design & build
Grade A office design & build
Grade A office design & build
Grade A office design & build
Grade A office design & build

Download the Office portfolio & company profile

Fill in your details — get the segment portfolio and AIC company profile 2026 (PDF)

  • Office Portfolio 2026 — English
  • Company Profile 2026 — English

No spam · used only to send documents & follow up

Frequently asked questions

Grade A office design & build

What makes a Grade A office different from a standard one?

Mainly the consistently high finish standard and the services: premium materials, a carefully invested lobby and meeting rooms, MEP tied into the building systems to standard, and close coordination with building management. All of it needs planning from the design stage.

How much does a Grade A office fit-out cost?

Cost depends on floor area, finish level, materials and the volume of MEP works. AIC takes off quantities and prepares a detailed BOQ in about 4 hours from the floor plan, so you have realistic numbers before committing.

Does AIC work directly with the building management?

Yes. AIC registers the works, follows the building's rules and hours, coordinates tie-ins to the building's technical systems and hands over a complete as-built dossier ready for operation.

Start with a detailed BOQ.

Send us your floor plan — AIC prepares a detailed BOQ in about 4 working hours, with locked pricing and handover milestones in the contract.

Call Zalo Message Get a quote
Zalo