Fit-out cost in Vietnam 2026 — by project type

The ranges below are AIC's published general-contractor reference rates, with the scope each package covers. Your exact figure comes from quantifying the drawings — AIC returns a detailed, itemised BOQ within 4 working hours, free, and the price locks once the BOQ is signed.

Office

FDI & corporate office fit-out

See the office service →

Standard (Grade B+)

Ceilings · flooring · partitions · low-voltage electrical · essential furniture · Indicative — per drawings

from 4M VND/m²

FDI factory office (Grade A-)

Workstations · meeting rooms · coordinated MEP · bilingual documentation · FDI factory standard — recommended

5–8M VND/m²

Grade A premium

Full MEP/HVAC · fire-safety (PCCC) appraisal dossier · building-designated specialist contractors · High-rise / Grade A towers

8–12M VND/m²

Residential

Apartment & villa design and build

See the residential service →

Essential finishing

Paint · flooring · ceilings · electrical & plumbing · essential fixtures · Based on unit condition

from 5M VND/m²

Turnkey interiors

Design · build · joinery · essential smart home · Vinhomes/Masteri/Phú Mỹ Hưng

8–12M VND/m²

Villas / penthouses

Natural wood · Indochine · biophilic · smart home · Premium materials

12–15M VND/m²

Villas

Villa & mansion interior design & build

See the villas service →

Interior finishing

Ceilings · partitions · flooring · paint · joinery · lighting · Bare-shell villas

from 6M VND/m²

Turnkey interior

Joinery · sofas · curtains · décor · smart home · Honest materials, solid timber

per design

Premium mansion

In-depth design · imported materials · bespoke furniture · workshop QC · Large villas, fine detailing

bespoke rates

Retail & Showroom

Retail chain, showroom & F&B fit-out

See the retail & showroom service →

Kiosk / small store

Storefront · counters · signage · lighting · F&B takeaway, shops ≥30m²

priced by concept

Showroom / flagship

Adapted design · build · display joinery · lighting · OH!SOME/King Coffee tier

per brand book

Multi-site rollout

Standardised prototype · centralised production · multi-site QC · 6–14 weeks/store

chain unit rates

Restaurant & Café

Restaurant, café & F&B chain fit-out

See the restaurant & café service →

Café / kiosk

Bar counter · storefront · signage · lighting · seating · Take-away café, venues ≥40m²

priced by concept

Full-kitchen restaurant

Stainless kitchen · extraction · gas-water supply · waterproofing · dining interior · Hot-pot/grill, seafood, vegetarian, themed dining

per kitchen + MEP scope

Multi-site F&B chain

Standardised prototype · centralised production · rollout · multi-site QC · Tanto Faz / Com Nieu tier · 4-10 weeks/site

chain unit rates

Industrial

In-factory office & infrastructure fit-out

See the industrial service →

In-plant office

Partitions · ceilings · flooring · electrical · air-conditioning · workstations · Built-in office within the shell

priced by scope

Mezzanine / internal block

Mezzanine floors · stairs · meeting rooms · technical rooms · Space optimisation

per structural design

Support areas

Canteen · locker rooms · rest areas · wayfinding signage · Occupational-safety compliant

on request

Go deeper

Want the cost breakdown line by line?

The fit-out cost guide per m² breaks down every package — ceilings, flooring, partitions, MEP, loose furniture — per project type, including the items low-ball quotes conveniently leave out.

Pricing questions

Straight questions — straight answers

Get my free quote
Why is there such a wide price range?

Three main variables: finish level (materials, detailing), site condition (new shell versus renovation) and building constraints (working hours, landlord rules). The same 100m² office can differ twofold on these — so the ranges are indicative, and the real number comes from an itemised BOQ based on your drawings.

What is the 4-hour BOQ, and does it cost anything?

A BOQ (Bill of Quantities) itemises every work package: quantity, unit price, total — directly comparable against any other contractor. Send your drawings or floor photos and AIC returns a detailed BOQ within 4 working hours, free, no strings attached.

Will the price inflate mid-project?

The price locks to the signed BOQ. Extras only occur when you actively change the scope — and are always notified in advance through a transparent addendum for approval before any work proceeds.

Do these rates include design?

The table shows construction rates. Design is quoted separately under a design contract; the 3D concept is free when you sign design with AIC. Going full design & build keeps both under one accountable contractor — typically 3–5 weeks faster than hiring separately.